Posted on March 23, 2020 · Posted in Uncategorized

It’s here, the Department of Energy’s 2020 pump energy standards have taken effect. From now, on you need to be sure that any pumps you specify are compliant as of January 26, 2020.

Here at George A. Israel Jr., we want to make sure you have the most efficient system that meets or exceeds the highest standards today and into the future. Bell & Gossett was the first company to embrace the DOE’s 2020 pump energy standards. Our entire line of e-Series pumps meets or exceeds those standards today. No other pump manufacturer can make that claim, so why take a chance specifying anything else?

About the Author